Skip to content
Topic: VTP & DTPSwitch

Extension practice

VTP & DTP Practice Questions

Extension practice: VTP modes and DTP negotiation beyond the published blueprint.

Author-reviewed by LabFabric · 7 September 2026 · Report a content issue

One solved question, so you can see how these are marked

What is the primary purpose of VTP (VLAN Trunking Protocol) in a multi-switch campus network?

Synchronize VLAN databases among switches in the same VTP domain

VTP propagates VLAN creation, deletion, and renaming from a server switch to other switches in the same VTP domain over trunk links, avoiding the need to manually configure identical VLANs on every switch.

Every question in the set below is marked like this. The answers stay hidden until you pick one.

Find related practice in the CCNA path
All 11 VTP & DTP questions in this set

Answers and explanations appear when you work through the set above.

  1. Which command sets a switch's VTP domain name, a prerequisite for VTP to actually synchronize VLAN information?

    • vtp domain <name>
    • vtp mode server
    • vtp password <domain-password>
    • hostname <switch-hostname>
  2. A switch is configured in VTP transparent mode. What does this mean for its VLAN database?

    • It cannot have any VLANs configured at all
    • Maintains its local VLAN database independently while forwarding VTP ads
    • Becomes the domain's server automatically and distributes its local VLAN database to clients
    • It deletes all VLANs whenever it receives an advertisement
  3. Why would an administrator deliberately configure a switch in VTP client mode rather than server mode?

    • Client switches can create VLANs locally but cannot delete them
    • Learns server VLANs while preventing local VLAN database changes
    • Client mode is required for switches with fewer than 24 ports
    • Client mode disables trunking on that switch
  4. Which VTP field increases every time a VLAN is added, deleted, or renamed on a VTP server, and is used by other switches to decide whether to accept an advertisement?

    • The MD5 checksum
    • VLAN database configuration revision
    • The length of the VTP domain name
    • The VTP version
  5. A switch that had previously been a VTP server in another domain, with a high configuration revision number, is added to a new production network still in client mode. What is the risk?

    • It has no effect since client mode switches cannot make changes
    • A stale higher revision can overwrite the production VLAN database
    • The switch will automatically reset its revision number to 0 upon joining
    • It will simply be ignored by other switches in transparent mode
  6. Which command displays the current VTP mode, domain, configuration revision number, and number of existing VLANs on a switch?

    • show vtp status
    • show vlan brief
    • show vtp counters
    • show running-config vtp
  7. What is the purpose of DTP (Dynamic Trunking Protocol)?

    • Synchronize VLAN identifiers and names across switches in one management domain
    • Negotiates trunk or access mode
    • Elects the spanning-tree root bridge for every VLAN
    • Prevents VLAN hopping by encrypting untagged frames
  8. Two switchports are both set to switchport mode dynamic auto. What is the resulting link state?

    • The link becomes a trunk
    • The link remains access because neither side initiates DTP
    • The link is disabled until both native VLANs are set to match
    • The link negotiates to EtherChannel
  9. Which command disables DTP negotiation messages on a port entirely, commonly recommended as a security hardening step on access ports?

    • switchport nonegotiate
    • switchport mode dynamic auto
    • no switchport trunk
    • vtp mode off
  10. In VTP version 1 and 2, which VLAN range is NOT propagated by VTP, and must be configured manually on every switch that needs it?

    • Normal-range VLANs, IDs 1 through 1005
    • Extended VLAN range, IDs 1006 to 4094
    • VLAN 1 only
    • The native VLAN only
  11. An administrator wants to prevent VTP-related outages entirely across the whole campus. What is the most robust design choice?

    • Set every switch to VTP client mode so none can originate changes
    • Transparent mode, independent VLAN databases
    • Disable trunking throughout the campus switches
    • Run VTP version 1 instead of version 2 on all switches