Back to Virtual Labs
Data Center · DCCORHeavyComing soon

Implementing Cisco Data Center Core Technologies

Duration: 5 DaysAvailability: 6 LabsResources: 16 vCPU · 32 GB RAM

Overview

The CCNP Data Center core lab: Nexus switching, DC networking, storage and automation, run against real Nexus hardware rather than a topology diagram.

Images included

  • Cisco Nexus 9000v (NX-OS) switches in a vPC pair
  • A Cisco MDS-class Fibre Channel switch image for DC storage basics
  • A Linux jump host image with Python and NX-API tooling

Environment & resources

A Nexus 9000v switching pair with storage-networking access, so both traditional NX-OS switching and DC storage workflows are available in the same lab.

Heavy lab · 16 vCPU · 32 GB RAM

Data-center and identity-scale gear: fabric switches and appliances that need real headroom.

FAQ

Is this exam a prerequisite for the DC concentration exams?

DCCOR is the core exam for CCNP Data Center; the concentration labs (DCID, DCIT, DCSAN, DCMDS) build on it.

What switching platform does this run on?

Cisco Nexus 9000v, matching the NX-OS surface the exam blueprint tests.

This lab is coming soon

This lab is still being built, so it is not bookable yet. Book a demo and we will let you know the moment it goes live.